{"id":532,"date":"2018-03-23T16:55:51","date_gmt":"2018-03-23T16:55:51","guid":{"rendered":"https:\/\/hrbusinessmonitor.eu\/?p=532"},"modified":"2018-03-23T16:55:51","modified_gmt":"2018-03-23T16:55:51","slug":"hz-infrastruktura-chooses-a-contractor-for-the-zagorje-zabok-line","status":"publish","type":"post","link":"https:\/\/hrbusinessmonitor.eu\/index.php\/2018\/03\/23\/hz-infrastruktura-chooses-a-contractor-for-the-zagorje-zabok-line\/","title":{"rendered":"H\u017d Infrastruktura Chooses a Contractor for the Zagorje &#8211; Zabok Line"},"content":{"rendered":"<p><span style=\"color: #000000; font-family: Calibri;\"><a href=\"https:\/\/www.tportal.hr\/biznis\/clanak\/hz-infrastruktura-odabrala-izvodaca-radova-za-posao-od-614-milijuna-kuna-foto-20180323\">H\u017d Infrastruktura<\/a> chose an Austrian company Swietelsky as a contractor to modernize and electrify the Zapre\u0161i\u0107 \u2013 Zabok line. The works are worth a total of Kn 614.4 million, 85% of which will come from the EU funds. <\/span><!--more--><\/p>\n<p><span style=\"color: #000000; font-family: Calibri;\">This part of the line is 24 kilometers long, and once the works are done, the travel time for fast trains will be reduced by half, and those of regular passenger trains by 30%. It will also become possible to include this line into the Zagreb suburban transport node. The works are scheduled to begin this summer and be completed three years later. <\/span><\/p>\n<p><span style=\"color: #000000; font-family: Calibri;\">The line stretches through two counties, Zagreb and Krapina-Zagorje. The works should enable the speed to be increased to 120 km\/h. Six kilometers of line will change completely, and stations in Novi Dvori, Luka, Veliko Trgovi\u0161\u0107e and Zabok will also be reconstructed. This is supposed to include new terminals, splitting the Zabok station into cargo and passenger terminals, and some new buildings. Minor stops in Pojatno, Kupljenovo and \u017deinci will also get new tracks, covers and parking, and a new video surveillance system. In addition, 15 crossings will receive new synthetic flooring, four will be diverted to new crossings, and one will be closed altogether. Finally, the contract includes five new bridges in Vu\u010derna, Lu\u017eki Potok, \u010crnec and two in Horvacka.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>H\u017d Infrastruktura chose an Austrian company Swietelsky as a contractor to modernize and electrify the Zapre\u0161i\u0107 \u2013 Zabok line. The works are worth a total of Kn 614.4 million, 85% of which will come from the EU funds.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"_links":{"self":[{"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/posts\/532"}],"collection":[{"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/comments?post=532"}],"version-history":[{"count":1,"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/posts\/532\/revisions"}],"predecessor-version":[{"id":533,"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/posts\/532\/revisions\/533"}],"wp:attachment":[{"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/media?parent=532"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/categories?post=532"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hrbusinessmonitor.eu\/index.php\/wp-json\/wp\/v2\/tags?post=532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}